Follow

@mhjohnson We replaced the boilers a few years back at Aurora Central HS and I scanned the boiler room and “steam” tunnels. It was built in the mid 50’s. Though asbestos was everywhere, the whole school could have fit down there. Hundreds of feet of 12’ wide, 7’ tall tunnels.

Sign in to participate in the conversation
Camp Duffel

We Do Camps!